pallettes in back of truck

-scmc-

PRODUCTION SEQUENCING IN PRODUCTION PLANNING DETAILED SCHEDULING

Fortune 50 CPG Food & Beverage; 65B

Limited Sequencing Functionality Within the Legacy Environment

 

-Limited capabilities around creating a consistent, predetermined sequence for production scheduling in order to maximize manufacturing output.

 

-The typical “color wheel” process is very difficult to model in legacy PPDS using standard configuration and master data.

Utilized Product Master Data and Detailed Scheduling to Model Production Sequencing

 

-This solution utilizes core functionality within APO to define an optimal sequence to minimize setup and transition times.

 

-Schedule orders either interactively or through a background process.

 

-Simplify master data maintenance.

Maximized Efficiency in Production Schedule

 

-Sequencing and scheduling are configured to support a consistent, operationally efficient schedule based on optimal operational production flow.

 

-Complete flexibility in master data management to support dynamic operational needs.

 

-Does the “heavy lifting” for the scheduler, allowing them to focus on managing exceptions.

 

-20% reduction in scheduler effort to create a consistent schedule.