-scmc-

Pre-Build with Master Data

Food & Beverage; 7B

Misuse of Application Strengths

 

-Client lacked the tools to manage pre-build crop supply with year-round customer demand.

 

-Time Phased Safety Stock Pre-build solution did not improve crop outage performance.

 

-Safety Stock management required excessive maintenance to manage every item/location weekly target.

Align Application Capabilities

 

-Utilize master data to model external crop and seasonal component constraints.

 

-Routings and BOM modifications to eliminate PPDS / SNP seasonality customizations.

 

-Enable supply networking heuristics and optimizer modeling, without master data modifications.

 

-Implement current and seasonal demand in to one production plan.

Improved Inventory Utilization

 

-Enabled “What if” scenario planning to evaluate pre-build plans 75% faster.

 

-No longer misusing Safety stock planning to manage seasonal pre-build planning.

 

-30% Reduction of excess inventory.